Approved Plans for 2008 Grant Street (TM 2021-1 & DR 2021-3)
PROJECT LOCATION: 2008 Grant Street, Calistoga, CA 94515 (APN 011‐010-033)
2008 Grant Street Draft IS/MND with MMRP
Appendix B - Air Quality and Greenhouse Gas Assessment
Appendix D - Biological Resources Assessment
Appendix E - Cultural Resources Constraints Analysis (Non-confidential)
Appendix F - Historic Resource Evaluation (Non-confidential)
Appendix G - Geotechnical Investigation
Appendix H - Phase I Environmental Site Assessment
Appendix I - Stormwater Control Plan
Appendix J - Noise and Vibration Study
Estimated Construction Schedule:
March 2023-June 2023: Importing dirt to the site
June 2023 - September 2023: Full mass grading to prep for utilities/ infrastructure
September 2023- Spring 2024: Construction of homes